Questions? +32 460 22 69 91 (English). Holiday Tue 17 Nov – dispatch Wed 18 Nov.
Transfer station for draining condensate from the boiler. H = max. 5.5 m, Q = 0.3 m3/h. More information
Delivery to Belgium (days are avarages)
DHL Express: 0.9 workday, € 22,99
| Dimension | 258x183x165 |
| Maximum temperature | 50 °C |
| Number of inputs | 4 |
| Power Supply | 230 VAC |
| Pump flow rate | 0.16 l/s |
| Pump head | 5.5 m |
| Volume | 2.65 l |
| Weight | 4.05 kg |
Datasheet download
Download PDFThe Grundfos CONLIFT lifting station is designed for pumping condensate from equipment installed below sewer level, where natural gravity drainage cannot be used for discharge.
Suitable for
|
Features
|
The draining condensate is collected in a tank which, once the switching level is reached, is automatically pumped out. The tank is equipped with a float microswitch that switches the pump on / off.
The lifting station also includes a thermal switch which switches off the motor in the event of overload. Once it has cooled down to normal temperature, the motor starts up again.
The Conlift station is designed for max. 60 starts per hour.

|
The Grundfos CONLIFT 2 +pH lifting station is designed for pumping condensate from equipment installed below sewer level, where natural gravity drainage cannot be used for discharge. Conlift pH+ is suitable for pumping condensate with a pH above 2.5. It includes a neutralisation unit, which is recommended for use with boiler outputs above 200 kW and pH below 2.5. For full replacement, the following three components must be purchased separately: |
||
| pH+ Box
|
||
We respond to your product queries as quickly as possible, usually within 24 hours.